GREECE - HELIPORT REFUELLING FACILITY
Design Review and Technical Services
Greece – Heliport Refuelling Facility
Completed: 2023
Design Review and Technical Services for the construction of a helicopter refuelling facility in compliance with JIG 4 (Aviation Fuel Quality Control & Operating Standards for Smaller Airports).
- Review of the Detailed Design (DD) for the full project, including drawings, equipment, facilities, and Material Take-Off (MTO).
- Assessment of the construction of the new helicopter refuelling facility for compliance with international standards, specifically JIG 4.
- Technical services to confirm the safe and efficient filling, flushing, and commissioning of the fuel facilities, including preparation of the required method statements.
- On-site wet commissioning and operator training covering all aspects of fuel handling, filtration, and helicopter refuelling operations.

