GREECE - HELIPORT REFUELLING FACILITY

Design Review and Technical Services

THE POWER TO BUILD

Greece – Heliport Refuelling Facility

Completed: 2023

Design Review and Technical Services for the construction of a helicopter refuelling facility in compliance with JIG 4 (Aviation Fuel Quality Control & Operating Standards for Smaller Airports).

  • Review of the Detailed Design (DD) for the full project, including drawings, equipment, facilities, and Material Take-Off (MTO).
  • Assessment of the construction of the new helicopter refuelling facility for compliance with international standards, specifically JIG 4.
  • Technical services to confirm the safe and efficient filling, flushing, and commissioning of the fuel facilities, including preparation of the required method statements.
  • On-site wet commissioning and operator training covering all aspects of fuel handling, filtration, and helicopter refuelling operations.

ISO 9001: 2015
ISO 45001: 2018
ISO 14001: 2015