NEW HYDRANT RESTORATION – HERAKLION AIRPORT (KASTELLI)

Critical Fuel Infrastructure Rehabilitation

THE POWER TO BUILD

Critical Fuel Infrastructure Rehabilitation

The restoration of the fuel hydrant system at the New Heraklion International Airport required excavation, pipeline installation, certified welding, pressure testing and controlled backfilling works. Executed in a technically demanding environment, the project ensured compliance with aviation fuel system specifications and international safety standards.
The rehabilitation reinforced system integrity and operational readiness within a strategic regional aviation asset.

ISO 9001: 2015
ISO 45001: 2018
ISO 14001: 2015